Enter your 14-digit reference number in the checker above and click Check Bill. Your SEPCO bill amount, due date, units consumed, FAC, and arrears load in under 5 seconds from the official PITC gateway. Free PDF download. No login. Works on 2G — important for rural SEPCO areas in Ghotki, Kashmore, and remote Dadu talukas.
Reference number missing? Call SEPCO helpline at 071-3310901 (Mon–Sat, 8 AM–8 PM) with your full address or CNIC. Also check any previous JazzCash payment receipt for the reference number.
What Is SEPCO — and Why Almost Every Other Site Gets Its Territory Wrong
⚠ Critical corrections from the old page — please update in CMS:
Territory:SEPCO covers upper (northern) Sindh — NOT lower Sindh. Lower Sindh is HESCO. The old page repeatedly says "lower Sindh" — this is wrong.
Consumer count:3 million+ consumers — NOT the 2 million the old page states.
Helpline:SEPCO helpline is071-3310901— NOT 021-111-000-020 (that is HESCO's Hyderabad number).
Jacobabad:Jacobabad is SEPCO territory — the old page incorrectly places it under HESCO.
Founded:SEPCO was established26 July 2010— separated from HESCO, NOT from WAPDA in 1998 like other DISCOs.
SEPCO — Sukkur Electric Power Company — is Pakistan's youngest major DISCO. Unlike every other electricity distribution company separated from WAPDA in 1998, SEPCO was carved out of HESCO as recently as 26 July 2010, when the government decided northern Sindh's unique agricultural and geographic character required its own dedicated distribution company. If you have paperwork or a saved JazzCash biller that still says HESCO for an upper Sindh address, update it to SEPCO.
SEPCO's headquarters are in Sukkur — the third-largest city of Sindh and the commercial centre of northern Sindh's vast irrigation belt. The company serves one of the world's most consequential agricultural regions: the territory fed by the Sukkur Barrage and Guddu Barrage on the Indus River, supporting millions of acres of cotton, rice, sugarcane, and wheat cultivation.
2010Founded 26 July 2010 — youngest major DISCO, split from HESCO
3M+Consumers across upper Sindh — not 2M as old page claimed
3Operational circles: Sukkur, Larkana, Dadu
Rs. 38BSindh govt owed to SEPCO — 323 facilities disconnected Jan 2025
7–11 PMSEPCO peak hours — TOU billing applies for industrial consumers
50°C+Jacobabad peak summer temperature — within SEPCO territory
SEPCO's 3 Operational Circles — The Correct Map of Upper Sindh
SEPCO operates through 3 circles covering northern Sindh's Sukkur, Larkana, and Dadu divisions. Every billing complaint, meter dispute, and new connection goes through your specific circle. The company name on your printed bill is the definitive proof you are a SEPCO consumer — not the city name, not the postal address.
🏙️ Sukkur Circle
Districts:Sukkur, Khairpur, Ghotki, Kashmore/Kandhkot
Key areas:Sukkur city, Rohri, Khairpur city, Ghotki, Kandhkot, Kashmore, Ubauro
Contains Guddu Thermal Power Station (Kashmore) and Pakistan's date palm capital (Khairpur). Ghotki borders Punjab — some Rahim Yar Khan areas near the Sindh boundary bill through SEPCO.
Headquarters circle — Guddu power station in territory
🌾 Larkana Circle
Districts:Larkana, Shikarpur, Jacobabad, Kamber-Shahdadkot
Key areas:Larkana city, Shikarpur, Jacobabad city, Shahdadkot, Ratodero, Warah
Jacobabad — one of Earth's hottest cities at 50°C+ summer peaks — is a Larkana Circle consumer, not HESCO. Larkana's rice belt drives one of SEPCO's largest seasonal load spikes.
Jacobabad extreme heat zone — highest summer load
🌊 Dadu Circle
Districts:Dadu, portions of Naushahro Feroze (Shaheed Benazirabad), portions of Jamshoro
Key areas:Dadu city, Johi, Warah, Khairpur Nathan Shah, Mehar, portions of Naushahro Feroze
Note: The Dadu Circle overlaps with some Nawabshah (Shaheed Benazirabad) areas — the boundary with HESCO's Nawabshah Circle requires checking your bill header for confirmation.
Boundary circle — verify bill header near Nawabshah
Sukkur — HQKhairpur (dates)Larkana (rice)GhotkiKashmoreJacobabadShikarpurKamber-ShahdadkotDaduNaushahro Feroze (portions)
SEPCO vs HESCO — the boundary most sites get wrong: SEPCO = upper (northern) Sindh along the Indus from Guddu Barrage south to Dadu. HESCO = interior Sindh below that — Hyderabad, Mirpurkhas, Nawabshah city, Badin, Thatta. Jacobabad is SEPCO (Larkana Circle) — not HESCO. If your bill says HESCO and your address is in Jacobabad, your account was registered before the 2010 SEPCO split and may need updating. The company name at the top of your current bill is the definitive check.
SEPCO Powers the Sukkur Barrage — The World's Largest Irrigation System
Guddu Barrage — located in Kashmore, Sukkur Circle — serves 2.9 million acres across Kashmore, Jacobabad, Shikarpur, and parts of Balochistan. Both barrages draw their operational electricity from SEPCO's network. This is why SEPCO's reliability carries consequences beyond individual consumer bills — it underpins the agricultural productivity of nearly the entire upper Sindh economy.
The Guddu Thermal Power Station also operates within Kashmore district in SEPCO territory. Understanding this geography — two of Pakistan's largest barrages, a major thermal power station, and millions of acres of irrigated farmland — explains why SEPCO's consumer base and load pattern are unlike any other Pakistani DISCO's.
Upper Sindh's Four Billing Seasons — Each District Peaks at a Different Time
SEPCO is the only Pakistani DISCO whose territory produces all four major crop types simultaneously: dates (Khairpur), rice (Larkana), sugarcane (Ghotki/Sukkur border), and wheat (Jacobabad plains). Each crop cycle drives a distinct electricity demand pattern across different parts of SEPCO's network — and your bill will reflect whichever cycle dominates your district.
🌴 Khairpur — Pakistan's Date Palm Capital (May–Aug)
Khairpur district produces the vast majority of Pakistan's dates. Date processing facilities — sorting, drying, packaging — run high commercial load from May through August when dates ripen. Agricultural tube wells also peak during summer irrigation. A commercial consumer in Khairpur connected to date processing sees their highest bills in July and August, not in winter. Consumers who move from Sukkur city to Khairpur are often surprised that the district's billing pattern differs from nearby urban Sukkur.
🌾 Larkana — Rice Belt (Sept–Nov)
Larkana, Kamber-Shahdadkot, and surrounding areas are Pakistan's rice belt. Rice husking mills — which operate 18 to 22 hours daily during peak season — create one of SEPCO's most concentrated industrial load spikes from September through November. Commercial and small industrial consumers connected to rice processing see bills that spike 40 to 60% above their summer levels. A Larkana rice mill owner's November bill bears no resemblance to their February bill.
🎋 Ghotki & Sukkur Border — Sugarcane (Oct–March)
The Ghotki-Sukkur border belt and Shikarpur areas grow significant sugarcane. Sugar processing mills run around the clock from October through March — drawing heavy three-phase industrial load for 5 to 6 months. These mills are among SEPCO's largest industrial consumers by monthly unit count. Agricultural tube wells in sugarcane areas also intensify during field preparation in October.
🌡️ Jacobabad — Extreme Heat Residential (May–Sept)
Jacobabad is in SEPCO's Larkana Circle. It regularly records temperatures above 50°C and has multiple times exceeded wet-bulb 35°C — the threshold above which the human body cannot cool itself. Jacobabad's residential consumers face their highest bills in May through August — ceiling fans running 20 hours daily, water coolers operating continuously. A Jacobabad household with any AC unit will cross the 200-unit slab easily by June. The 14 to 16 hour load shedding documented in June 2026 is a Larkana Circle reality.
Agricultural tube well consumers in SEPCO territory: Tube well connections in SEPCO's rice and sugarcane belt carry the agricultural D3 tariff — a completely different rate structure from domestic A-1P. Many rural SEPCO consumers have two separate connections: one household domestic meter and one tube well meter. Keep both reference numbers stored separately in your phone under different labels. Paying the tube well account's balance from the household account — or comparing the two bills as if they should match — causes more billing confusion in rural Sindh than any other single error.
SEPCO Disconnected 323 Sindh Government Facilities in January 2025 — What It Means for Consumers
⚠ January 2025 — SEPCO vs Sindh Government: Rs. 38 Billion Owed
In January 2025, SEPCO CEO Eijaz Ahmed Channa announced that SEPCO disconnected power supply to 323 Sindh government connections across 10 districts — including Sukkur Municipal Corporation, street lighting systems, the irrigation department, and various government institutions — because the Sindh government owed SEPCO approximately Rs. 38 billion in accumulated unpaid bills. This action affected public services including road lighting and government-operated facilities.
This matters for private SEPCO consumers because government arrears directly affect SEPCO's operational budget — including maintenance, fault response times, and the ability to invest in network upgrades. A DISCO owed Rs. 38 billion by its own provincial government faces constrained resources for the infrastructure improvements that reduce outages and billing errors for every consumer on its network.
The dispute also highlights a dynamic unique to SEPCO: its territory is managed by the Sindh provincial government while SEPCO itself reports to the federal Power Division. When province and DISCO are in financial conflict, private consumers experience delayed fault responses and deferred maintenance as collateral consequences — even when their own bills are fully paid and current.
How to Check Your SEPCO Bill — 3 Methods That Work in Upper Sindh
Method 1 — Online via ECheckBills (Fastest, Works on 2G)
Enter your 14-digit reference number in the checker above and click Check Bill. ECheckBills queries the PITC gateway with server-side caching that keeps the page fast through SEPCO's peak congestion window — 10 AM to 2 PM around the monthly due date when sepco.com.pk slows under simultaneous load from 3 million+ consumers. The page is deliberately lightweight — it loads usably on 2G mobile data, which matters for consumers in Ghotki, Kashmore, rural Jacobabad, and remote Dadu talukas where 4G coverage is unreliable.
Rural SEPCO consumers — download when you have signal. In remote talukas of Kashmore, Kandhkot, and Johi, mobile connectivity is patchy. When you reach a town with reliable signal — at a bank branch, a NADRA e-Sahulat center, or a market — open ECheckBills and download the PDF immediately. The downloaded PDF needs no internet to display. Check, download, and plan your payment in one trip.
Method 2 — SEPCO Helpline 071-3310901
Call SEPCO's helpline (Mon–Sat, 8 AM–8 PM) with your full address, CNIC, or meter number. Staff retrieve your reference number while you wait. Also use this number to confirm your specific circle office for in-person complaints — Sukkur Circle, Larkana Circle, or Dadu Circle — before making an in-person visit to avoid a wasted trip across SEPCO's geographically spread territory.
Method 3 — SEPCO Official Portal sepco.com.pk
SEPCO's official portal provides load shedding schedules by division and district — information not available through ECheckBills. Use it specifically to check your district's current weekly outage schedule, particularly during monsoon season when flooding regularly affects feeder infrastructure in Kashmore, Kandhkot, and the Guddu Barrage areas. Bill checking works through the portal but is slower than ECheckBills during peak hours.
SEPCO's 7 PM to 11 PM Peak Hours — What Time-of-Use Billing Means for Upper Sindh
SEPCO industrial and certain high-load commercial consumers are on Time-of-Use billing. Your per-unit rate changes based on when you consume electricity — peak hours cost more, off-peak hours cost less. SEPCO's defined peak window is 7 PM to 11 PM daily.
⬆ Peak: 7 PM – 11 PMHigher per-unit rate applies for every unit consumed in this 4-hour window. For rice husking mills, date processing units, and sugar mills running evening shifts, scheduling heavy-draw machinery in this window adds significantly to monthly bills.
⬇ Off-Peak: 11 PM – 7 PMAll remaining 20 hours. Significantly lower rate. Agricultural pump irrigation, cold storage loading, and industrial processing can be shifted to early morning (3–6 AM) or afternoon (12–4 PM) to avoid the peak surcharge entirely.
Sukkur Circle's rice mills in the Larkana-Shikarpur belt that operate three daily shifts can save meaningful amounts monthly by scheduling high-consumption processes — grain cleaning, rice milling, husk burning for energy — during the off-peak window. A mill consuming 30,000 units monthly that shifts 25% of its load away from the 7–11 PM peak window saves Rs. 15,000 to Rs. 40,000 monthly at 2026 TOU rate differentials.
Every Charge on Your SEPCO Bill — Including Sindh's Specific Levies
SEPCO collects charges set by NEPRA, FBR, and the Sindh provincial government. None are set by SEPCO independently. Knowing who sets each charge tells you who to contact when one looks wrong.
Bill Field | Set By | Variable? | What to Check |
|---|---|---|---|
Tariff Category (A-1P / A-1) | NEPRA rules | Conditional — 6-month history | A-1P = Protected (≤200 units for 6 months). A-1 = Unprotected. Crossing 200 once reprices ALL units and locks you UP for 6 months |
Agricultural Tariff (D3) | NEPRA — agricultural | No — fixed per category | SEPCO tube well consumers: D3 is a completely different schedule from domestic A-1P. Never compare the two as equivalent |
Units Consumed | Your meter | Yes | Subtract previous from current reading — must match. "EST" means estimated reading — photograph your meter immediately if you see it |
Fixed Monthly Charge | NEPRA — SRO 279(I)/2026 | No — per kW sanctioned load | New in 2026. Applies per kW even with zero consumption. Agricultural D3 connections have separate fixed charge structure |
Energy Charges | NEPRA — slab rates | Yes — units × slab rate | Verify with bill calculator. Slab crossing reprices ALL units — not just extras above the boundary |
TOU Peak Charge | NEPRA — TOU tariff | TOU connections only | If your bill shows TOU tariff: units consumed 7–11 PM attract peak rate. Shift industrial loads to off-peak hours to reduce this charge |
FAC (Fuel Adjustment Charge) | NEPRA — monthly | Yes — changes every month | Northern Sindh summer: Rs. 600–2,200 added on typical bill. Track at FPA Tracker before bill arrives. GST also applies to FAC |
NJ Surcharge | Federal — Neelum-Jhelum project | No — Rs. 0.10–0.35/unit | Fixed — not a billing error |
FC Surcharge | Federal — circular debt | No — Rs. 0.43–3.23/unit | Fixed — not a billing error |
Sindh Electricity Duty | Sindh provincial government | No — Sindh-specific rate | Provincial levy — GST does NOT stack on this line. If your bill shows GST calculated on top of Electricity Duty, that is a billing error |
GST 17% | FBR — federal | Proportional | Applies to energy + FAC + NJ + FC surcharges. NOT on PTV fee or fixed charges. Lifeline consumers exempt |
PTV Licence Fee | Federal — PTV Corporation | No — Rs. 35 domestic flat | No GST — same for all consumers nationally |
Arrears | Previous unpaid balance | Yes — compounds at 10% | Monsoon flooding in Kashmore and Ghotki regularly disrupts payment access — if a flood prevented payment, contact your circle office immediately to request emergency hold |
Why Your SEPCO Bill Is Higher — Upper Sindh's Unique Billing Reality
SEPCO's territory contains some of the most extreme summer temperatures in the world and some of the most productive agricultural land in Asia. Those two realities drive bill spikes that follow different patterns depending on whether you are a residential consumer in Jacobabad or a commercial consumer near Larkana's rice belt.
Crossing 200 Units in Jacobabad's 50°C Heat
For residential consumers in Jacobabad, Sukkur, and Larkana city during peak summer, crossing 200 units is almost unavoidable. Ceiling fans running 18 to 20 hours in 50°C heat, water coolers, refrigerators running continuously — 200 units disappear before mid-month in a typical household. The slab crossing is financially severe.
✅ Protected — 195 Units~Rs. 1,950Base energy charges
❌ Unprotected — 215 Units~Rs. 5,590Rs. 3,640 more for 20 extra units
Crossing once locks you into the unprotected slab for 6 months. A June crossing in Jacobabad means elevated bills through December. Photograph your meter on the 1st and 15th of each month from April through September — mid-cycle tracking gives you 2 weeks to reduce consumption before the cycle closes. By the time the bill arrives, the decision is locked 4 weeks in the past.
FAC Peaks When Pakistan's Grid Burns Imported Fuel
NEPRA sets the Fuel Adjustment Charge monthly based on actual generation costs. Upper Sindh's summer — May through September — aligns with when Pakistan's grid burns maximum LNG to meet national cooling demand. In 2026, FAC ranged Rs. 1.50 to Rs. 6.80 per unit. On a 300-unit SEPCO bill, that swing is Rs. 450 to Rs. 2,040 in addition to base energy charges. Track current FAC at the FPA Tracker.
Monsoon Flooding Disrupts Billing but Not Meter Readings
Kashmore, Kandhkot, Ghotki, and parts of Jacobabad district flood during monsoon months (July–September). Flooded streets prevent both meter readers from visiting and consumers from reaching payment points. SEPCO still generates bills based on available readings or estimates. If your area flooded and you cannot pay before the due date, call your circle office immediately — NEPRA provisions allow SEPCO to issue emergency billing holds for disaster-affected consumers. Document the flooding with photographs for your records.
How to File a SEPCO Billing Complaint
Photograph your meter — dated, with reading and serial number visible.In remote SEPCO areas where readers visit infrequently, your dated meter photograph is the only reliable evidence of actual consumption on a specific date. Take it immediately when you receive a suspect bill.
Call SEPCO helpline 071-3310901 first.Give your 14-digit reference number and describe the specific discrepancy with exact figures. Note the complaint number. Urban Sukkur and Larkana complaints typically resolve by phone within 7 days. For remote district consumers, an in-person subdivision visit is usually faster.
File online via CCMS at ccms.pitc.com.pk/complaint.Select Billing Complaint, enter reference number, describe the issue with specific figures (bill shows X units, meter reads Y), attach meter photograph, submit. Save the CCMS tracking ID — you need it for every follow-up and NEPRA escalation.
Visit your circle subdivision office in person.SEPCO's 3 circles span a huge geographic area — but each circle has subdivision offices distributed across the territory. An in-person visit with your CNIC, disputed bill printout, meter photo, and payment receipts creates a direct face-to-face record. For consumers in Kashmore or Ghotki whose subdivision is nearby, this is often faster than waiting for the phone channel to resolve.
Escalate to NEPRA after 30 days without resolution.File at nepra.org.pk/complaintsregulatory.aspx with your CCMS tracking number. NEPRA's consumer helpline is 0800-63772. NEPRA can compel SEPCO to correct errors and issue refunds for overcharges.
Pay before disputing — always. SEPCO can disconnect supply for non-payment even during an active complaint. In Jacobabad's 50°C summer heat, losing electricity to a disconnection is dangerous — not just inconvenient. Pay the undisputed amount before the due date. Reconnection fees plus the 10% late surcharge compound on top of whatever amount is already disputed.
How to Pay Your SEPCO Bill in Upper Sindh
Method | Fee | Clears In | Notes for Upper Sindh |
|---|---|---|---|
JazzCash app | Free | 2–4 hours | Most widely used across upper Sindh — JazzCash agent network extends to small Kashmore and Ghotki towns |
EasyPaisa app | Free | 2–4 hours | Alternative mobile wallet — also has agents in smaller upper Sindh towns |
Raast (any bank app) | Free | Instant | Fastest clearance — best choice when approaching due date |
HBL / Meezan / MCB internet banking | Free | Same day | All major banks support SEPCO |
UBL Omni agent | Free | Same day | Available in smaller towns where full bank branches are absent |
1-Link ATM | Rs. 20 | Same day | Available in Sukkur, Larkana, Khairpur, Ghotki, Jacobabad district centers |
SEPCO franchise counter | Free | Immediate | Cash payment — most Sukkur and Larkana city franchises accept PDF on phone screen |
NADRA e-Sahulat | Rs. 10–20 | Same day | Critical for rural Kashmore, Kandhkot, Johi, and remote Dadu talukas where banks are absent |
Pakistan Post | Free | Same day | Post offices accept SEPCO bills across upper Sindh — useful in Shikarpur and smaller towns |
Pay at least 2 days before the due date. Online payments take up to 4 hours to clear. In upper Sindh's monsoon months — July through September — mobile connectivity drops in flooded areas and banking apps can have maintenance windows. Initiate payment as soon as your bill appears online, not on the due date. A 10% surcharge on a Rs. 5,000 Sukkur summer bill is Rs. 500 avoidable with a 3-minute JazzCash payment.
5 Ways to Reduce Your SEPCO Bill — Specific to Upper Sindh
For Jacobabad and Sukkur households: use a desert cooler during dry months. Upper Sindh's pre-monsoon months (April through June) are dry and extremely hot — exactly when desert coolers work best. An evaporative cooler draws 200 to 350 watts versus 1,200 to 1,500 watts for a 1.5-ton AC. Running a cooler instead of AC for 6 hours daily saves 65 to 80 units monthly — often the difference between staying protected (under 200 units) and crossing into the expensive unprotected slab. July and August bring monsoon humidity that reduces cooler effectiveness; switch to AC in those weeks only.
Photograph your meter on the 1st and 15th every month from April through September. In upper Sindh's long summer — April through September is 6 months of elevated heat — the 200-unit boundary is the most expensive billing event for residential consumers. Mid-cycle tracking gives you 2 weeks to reduce fan hours, defer washing machine cycles, or reduce AC temperature set points. After the billing cycle closes, that decision is 4 weeks in the past.
For Khairpur and Larkana agricultural consumers: shift tube well irrigation to off-peak hours. If your agricultural or commercial connection is on TOU billing, running irrigation pumps during the 7–11 PM peak window costs significantly more per unit than running them at 4–8 AM or 12–3 PM. Over a full rice or cotton irrigation season, that time shift saves meaningful amounts on a heavy-draw tube well connection.
For Larkana and Ghotki industrial consumers: investigate solar. Upper Sindh receives 5.0 to 5.5 kWh/kW/day of solar irradiance. Rice mills and sugar processing units that run daytime operations achieve 85 to 90% self-consumption ratios — the new Rs. 10–11/unit export credit under NEPRA Prosumer Regulations 2026 barely matters when most of your generation goes directly to production at full import price. Industrial payback periods run under 3 years at SEPCO's industrial tariff rates.
Pay via JazzCash 2 days before the due date — every month without exception. In Jacobabad, where electricity is a safety necessity at 50°C and the 10% late surcharge on a Rs. 5,000 bill is Rs. 500, paying on time is not optional. JazzCash is free and processes SEPCO bills in 3 minutes. In monsoon months, pay the moment your bill appears online — do not wait for the due date and risk a connectivity failure during flooding.
SEPCO Contact Numbers — 2026
SEPCO Helpline071-3310901
National Fault Line118 (24 hrs)
NEPRA Consumer0800-63772
SEPCO Officialsepco.com.pk
SEPCO HQSukkur, Sindh
Frequently Asked Questions
Sources & Verification
Wikipedia — Sukkur Electric Supply Company — founded 26 July 2010, headquarters Sukkur, 3 operational circles (Sukkur, Larkana, Dadu)
Dawn — January 2025 — SEPCO disconnects 323 Sindh government facilities, Rs. 38 billion in unpaid government dues, 10 districts affected
Express Tribune — Sukkur Barrage staff unable to operate gate motors during SEPCO outage
Wikipedia — Sukkur Barrage — world's largest single irrigation work, 7.63 million acres, 10,417 km canals, opened 1932
Sindh Irrigation Department — Guddu Barrage — 2.9 million acres, Kashmore/SEPCO territory, commissioned 1962
NEPRA — S.R.O. 279(I)/2026 tariff, NEPRA Prosumer Regulations Feb 2026, monthly FAC, consumer complaint portal 0800-63772
SEPCO — Sukkur Electric Power Company — official portal, TOU peak hours 7–11 PM, helpline 071-3310901
PITC — central billing gateway, CCMS complaint system